RFQ

    EPC2111

  • Manufacturer:

    EPC

  • Description:

    GAN TRANS ASYMMETRICAL HALF BRID

  • Detailed Description:

    Mosfet Array 2 N-Channel (Half Bridge) 30V 16A (Ta) Surface Mount Die

  • Product Status::

    59712 In Stock

  • Data Sheet:

    EPC2111 Datasheet

    ECAD Model:

  • Quantity:




Certification Information

Product Attributes

Attribute Attribute Value
Mfr EPC
Series -
Package Tape & Reel (TR), Cut Tape (CT), Digi-Reel®
Product Status Active
FET Type 2 N-Channel (Half Bridge)
FET Feature GaNFET (Gallium Nitride)
Drain to Source Voltage (Vdss) 30V
Current - Continuous Drain (Id) @ 25°C 16A (Ta)
Rds On (Max) @ Id, Vgs 19mOhm @ 15A, 5V, 8mOhm @ 15A, 5V
Vgs(th) (Max) @ Id 2.5V @ 5mA
Gate Charge (Qg) (Max) @ Vgs 2.2nC @ 5V, 5.7nC @ 5V
Input Capacitance (Ciss) (Max) @ Vds 230pF @ 15V, 590pF @ 15V
Power - Max -
Operating Temperature -40°C ~ 150°C (TJ)
Mounting Type Surface Mount
Package / Case Die
Supplier Device Package Die

Buying Guide

1. When The Order Will Be Shipped Out And How To Track Your Order?

Inventory Orders Will Begin Processing Once GQGF Has Received Your Payment. Orders Typically Take 2-3 Days To Process And Then Ship.
For Backordered Orders, The Package Will Be Shipped After All Items Are Ready, Please Refer To The Delivery Time Information In The Quotation Result Before Payment.
Once The Courier Picks Up Your Order, You Will Receive An Email Notification With Tracking Information.

2. Shipment

If You Need To Change The Address Of Your Order, Please Contact Us With The Order Number And Your New Address Information.
If Your Order Has Already Been Dispatched, We Cannot Guarantee That Changing The Shipping Address Will Be Successful. So Please Check The Address Information Carefully Before Submitting Your Order Online. If The Package Has Already Arrived In The Destination Country, You Can Try To Contact The Local Courier Company Or Post Office To Change The Delivery Address Directly.
Notice.
Changes To The Shipping Address May Incur Additional Charges. All Additional Costs Should Be Paid By The Company.

3. Shipment Notifications

Kindly Note That The Delivery Time Can Be Influenced By Extreme Weather, Post Office Delay, Customs Clearance, Local Protest, Strikes, Epidemics, And Other Force Majeure Factors. In This Case, GQGF Is Incapable Of Guaranteeing 100% On-time Delivery, But We Will Try Our Best To Let You Receive Your Package ASAP.

Original In Stock:59712 Pcs MOQ:1PCS

  • QTY UNIT PRICE TOTAL PRICE
  • 1 $2.754 $2.754
  • 10 $2.6928 $26.928
  • 100 $2.6316 $263.16
  • 1000 $2.601 $2601
  • 10000 $2.5398 $25398

You May Also Be Interested In